title: "What electrical and telecom materials does a data centre build need, by work package? | Effex"
url: "https://info.effex.ee/en/answers/what-electrical-and-telecom-materials-does-a-data-centre-build-need-by-work/"
lang: en
description: "A data centre build needs electrical materials in the work packages that datacenterestimating.com names."
kind: answer
updated: 2026-11-18
sources: 6
---

This page in other languages: [Eesti](https://info.effex.ee/et/answers/milliseid-elektri-ja-sidematerjale-on-andmekeskuse-ehituseks-vaja-toopakettide/) · [Русский](https://info.effex.ee/ru/answers/kakie-elektro-i-telekommunikatsionnye-materialy-nuzhny-dlia-stroitelstva-data/) · [Suomi](https://info.effex.ee/fi/answers/mita-sahko-ja-telemateriaaleja-datakeskuksen-rakentamiseen-tarvitaan/)

[Home](https://info.effex.ee/en/) › [Answers](https://info.effex.ee/en/answers/) › What electrical and telecom materials does a data centre build need, by work package?

Answer [Data centres](https://info.effex.ee/en/data-centers/)

# What electrical and telecom materials does a data centre build need, by work package?

A data centre build needs electrical materials in the work packages that datacenterestimating.com names.

Published 17 November 2026 Last verified 18 November 2026

**On this page**

1. Which work packages make up a data centre's electrical scope?
2. What telecom and cabling materials does the network package need?
3. What cable containment and low-current systems does a data centre need?
4. What does EU policy say about data centre energy use?
5. What data centre materials can Effex supply?
6. FAQ
7. Sources
8. Products named

A data centre build needs electrical materials in the work packages that datacenterestimating.com names: utility and medium voltage, standby power, the UPS path and grounding. For the telecom side, Novatelx describes structured cabling as a standardised system of copper and fibre cables, connectors, panels and pathways. According to datacenterestimating.com, transformers and switchgear belong to the utility package of a data centre build, generators to standby power, and UPS units, batteries and power distribution units (PDUs) to the UPS path. [Effex for data centre sites](https://info.effex.ee/en/data-centers/) covers the stock part of these packages, such as cable management, circuit protection, lighting, racks and structured cabling parts, but not medium-voltage equipment, power transformers, generators or large UPS systems.

## Which work packages make up a data centre's electrical scope?

Wikota Electrical Services says a data centre that runs at medium voltage needs switchgear lineups, bus duct or cable distribution systems, and transformer vaults designed to support the redundancy the owner specifies. The UPS path, in the scope datacenterestimating.com describes, covers UPS units, batteries, bypass and PDUs. Wikota Electrical Services notes that UPS systems protect the data centre's IT load from interruptions and quality problems in the utility supply. Grounding, which datacenterestimating.com lists as a package of its own, covers the grid, bonding and equipment connections. Wikota Electrical Services describes the electrical build-out of the white space as overhead bus duct or busway, power distribution units, electrical connections for in-row cooling, branch circuit wiring to rack PDUs, and the grounding and bonding that protects IT equipment from faults.

## What telecom and cabling materials does the network package need?

Novatelx says structured cabling supports data, voice, Wi-Fi access points, CCTV, access control and building systems. Novatelx advises single-mode (OS2) fibre for backbones between buildings and long risers. According to Novatelx, multimode fibre (OM4, or OM5 where wideband multimode applications are planned) suits short, high-density links inside data centres.

## What cable containment and low-current systems does a data centre need?

SA3 Power says effective cable containment keeps cabling supported, protected and routed throughout a data centre, with room for future upgrades, maintenance and expansion. Snake Tray says its prefabricated cable trays keep proper spacing, turn radii and support for copper, fibre, telecom, ethernet and high-voltage cables in data centres from micro to hyperscale size. SA3 Power writes that extra-low-voltage (ELV) systems support a data centre's communication, monitoring and security infrastructure, including security systems and access control.

## What does EU policy say about data centre energy use?

Data centres account for about 1.5%, or 415 terawatt-hours (TWh), of the world's total yearly electricity consumption. The IEA projects in its report 'Energy and AI' that data centre electricity consumption will more than double towards 945 TWh by 2030, mainly because of energy-intensive accelerated computing for AI. The EU aims to triple its data centre capacity by 2035. The European Commission proposed a common rating scheme for data centres on 21 September 2026 to make their energy and water use more transparent. On 21 September 2026 the European Commission launched a public consultation and call for evidence on a planned legislative proposal for minimum performance standards for data centres.

## What data centre materials can Effex supply?

Effex for data centre sites arranges its range by the work packages of a data centre's electrical and telecom scope. For containment and terminations, Effex stocks cable ladders, cable trays, trunking, conduit, cable glands, cable markers, and cable lugs and sleeves. For final circuits and rack power, Effex carries miniature circuit breakers, residual current devices, surge protective devices, small UPS units, racks and IEC power leads (C13, C14, C19, C20). Medium-voltage equipment, power transformers, main switchboards, air circuit breakers, busbar trunking, generators, large UPS systems and pre-terminated MPO/MTP fibre trunks are outside the Effex range. Effex stocks the [Power distribution unit 19" 1U ALU 10X socket C13 plug C14 with surge protector](https://effex.ee/en/avalehele/10212-toitepaneel-19-1u-alu-10x-pesa-c13-pistik-c14-ulepingekaitsega.html) by Digitus (maker's code DN-95404), sold by the piece. Effex sells the [Cat6 F/UTP data cable](https://effex.ee/en/low-voltage-cables/1087-cat6-arvutikaabel.html) by DNS (maker's code CAT6\_FTP) by the metre in its low-current cables category.

## FAQ

### What electrical and telecom materials does a data centre build need, by work package?

A data centre build needs materials for the work packages datacenterestimating.com lists as utility and medium voltage, standby power, the UPS path and grounding. For the network, Novatelx describes structured cabling of copper and fibre cables, connectors, panels and pathways. SA3 Power counts cable containment and extra-low-voltage systems for communication, monitoring and security among the permanent electrical works of a data centre.

### Can Effex deliver data centre materials outside Estonia?

Yes, AS Effex ships goods to Latvia, Lithuania and Finland as well as within Estonia. Effex parcels go by SmartPOST, Omniva or DPD parcel lockers or by Omniva courier, and the delivery fee depends on the buyer's location and the delivery method and appears when the order is placed.

### Can a company return cable cut to length for a data centre build?

No, a company cannot use the Effex 14-day right of withdrawal, because it does not apply to legal persons or to goods cut to length. Wrong or faulty Effex goods are a separate case, because the buyer does not pay the return cost for goods that do not match the order. AS Effex is liable for defects that existed when the goods were handed over and appear within two years.

### Which documents come with electrical materials for a data centre build?

Effex hands over goods with delivery notes and, at the buyer's request, the documents that belong with the goods under Estonian and EU law. Effex sends the invoice to the buyer's e-mail or e-invoicing system after handover, or on paper to the recipient on request.

## Sources

- [What is in a data center electrical contractor scope?](https://datacenterestimating.com/guides/data-center-electrical-contractor-scope)
- [Structured Cabling \& Data Centre Standards Guide | Novatelx](https://novatelx.com/insights/structured-cabling-data-centre-standards.html)
- [Data Center Electrical Construction \& Commissioning | Wikota Electrical Services](https://wikotaelectricalservices.com/markets-we-serve/data-centers-mission-critical-facilities)
- [Data Centre Electrical Work: From Build to Handover | SA3 Power](https://www.sa3power.com/data-centre-construction-electrical-guide)
- [Data Center Cabling Guide | Snake Tray](https://www.snaketray.com/data-center-cabling-guide)
- [Energy performance of data centres - Energy - European Commission](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en)

*Last verified: 18 November 2026.*

## Products named in this article

Prices and stock come from this site's catalogue snapshot, not from the article's text, and are updated with it every day.

| Product | Brand | Code | Price incl. VAT | Stock | Table |
| --- | --- | --- | --- | --- | --- |
| [Power distribution unit 19" 1U ALU 10X socket C13 plug C14 with surge protector](https://effex.ee/en/avalehele/10212-toitepaneel-19-1u-alu-10x-pesa-c13-pistik-c14-ulepingekaitsega.html) | Digitus | DN-95404 | €32.24 (−31%) | in 1 of 9 stores: Tartu |  |
| [Cat6 F/UTP data cable](https://effex.ee/en/low-voltage-cables/1087-cat6-arvutikaabel.html) | DNS | CAT6\_FTP | €0.77 (−25%) | in 6 of 9 stores: Tartu, Jõhvi, Otepää, Põlva, Viljandi, Võru | [Low-current cables](https://info.effex.ee/en/catalog/210-low-current-cables/) |

Prices include VAT. Prices and stock as of 19 November 2026 at 5:47 (Estonian time). The shop at effex.ee always has the current price and stock.

- [All Low-current cables](https://info.effex.ee/en/catalog/210-low-current-cables/): 47 products with price and stock by store